Fifth Third Arena renovation

  • Date Completed: November 2018
  • Project Location: Cincinnati, OH
  • Project Category: Higher education
  • Project Owner: University of Cincinnati
Fifth Third Arena is a 213,000-square-foot indoor sports facility on the campus of the University of Cincinnati. ESI completed the electrical design/assist portion of the arena renovation, including demolition, distribution power throughout the building, interior and exterior lighting and power, low-voltage systems rough-in, fire alarm, lighting control, temporary power and lighting, and installation of a 1750 KW generator with associated feeders. ESI installed all new court lighting, theatrical lighting, confetti cannons and numerous videoboards, including a new center-hung scoreboard.